
ASTURFEITO
ASTURFEITO
2 Projects, page 1 of 1
assignment_turned_in Project2012 - 2015Partners:PKT, Cranfield University, Coventry University, FORMTEC, KTH +6 partnersPKT,Cranfield University,Coventry University,FORMTEC,KTH,University of Patras,CAMECO,SC,ASTURFEITO,FUNDACION PRODINTEC,ICTFunder: European Commission Project Code: 314024more_vert Open Access Mandate for Publications and Research data assignment_turned_in Project2024 - 2030Partners:TECNALIA, ETERMAR, TECAMB, OCEAN ENERGY EUROPE, OO +10 partnersTECNALIA,ETERMAR,TECAMB,OCEAN ENERGY EUROPE,OO,WAVEC/OFFSHORE RENEWABLES - CENTRO DE ENERGIA OFFSHORE ASSOCIACAO,European Marine Energy Centre,EFUND GROUP,Etermar Energia,QUB,AW-ENERGY OY,WISEPOWER SRL,SHELL GLOBAL SOLUTIONS INTERNATIONAL B.V.,EST,ASTURFEITOFunder: European Commission Project Code: 101172888Overall Budget: 25,457,300 EURFunder Contribution: 18,999,500 EURThe untapped potential of wave energy emerges as a promising horizon projected to reach up to 1,800 TWh per year in Europe. However, full operational conditions of a wave energy farm are required to improve market confidence and increase the bankability and insurability of wave energy commercial projects. In this context, ONDEP aims at setting up a 2MW farm composed of 4 WaveRoller units connected to the grid in Peniche, Portugal. This will leverage +10 years of experience at this site - including two years of full-scale demonstration of the patented and certified WaveRoller unit (2019-2021). Over five years and a half, ONDEP aims at emulating the needs and technical challenges of future extra large-scale wave farms, while establishing a complete end-to-end European supply chain for GW-scale deployment in Europe. It also includes the first comprehensive environmental analysis spanning several decades for wave energy production. ONDEP is a pathway to scale up wave energy farms: in the short term and by 2030, the project expects to unlock 11 farms in 8 countries across 4 continents, with a cumulative 83 MW capacity (MoUs and support letters already signed) and a GWP <25 gCO2eq/kWh. Beyond 2035, the expected LCOE (<100€/MWh) will pave the way towards a sustainable blue economy creating up to 500,000 jobs in Europe. To achieve its ambitious goals, ONDEP involves 9 countries and 14 leading organisations covering the whole end-to-end value chain of the wave energy sector.
more_vert