Powered by OpenAIRE graph
Found an issue? Give us feedback

RHEIN-NECKAR-VERKEHR GMBH

Country: Germany

RHEIN-NECKAR-VERKEHR GMBH

2 Projects, page 1 of 1
  • Funder: European Commission Project Code: 101095904
    Overall Budget: 23,575,500 EURFunder Contribution: 19,993,300 EUR

    UPPER aims at spearheading a Public Transport revolution that will strengthen the role of PT as the flagship of sustainability and innovation of mobility in cities, leading the transition towards a zero emission mobility which will become the cornerstone of climate neutrality by 2030, in line with the goal of Cities Mission and the priorities of the Green Deal. UPPER will put the Public Transport at the centre of the mobility ecosystem and will implement a combination of 84 push and pull measures, acting on the 5 innovation axes that condition user’s choices: mindset and culture, urban mobility planning, mobility services ecosystem, road network management and democratic governance. These measures will act in 4 different timescales (from shorter to longer-term): communication, operations, infrastructure and urban fabric. The UPPER measures will be supported by the UPPER Toolkit (U-TWIN, U-SIM, U-NEED, U-GOV, U-KNOW, U-TRANSFER and U-SUMP), 7 IT tools combining social and technological innovation that will be demonstrated within the measures in the 5+5 UPPER living labs and twinning sites, with the overall target of increasing the use of public transport by >30% and the user satisfaction by >25%, leaving nobody behind in the process. This integrated and holistic approach will ease the cooperation among authorities and operators, offer a physical and digital environment to test the measures, update the existing SUMPs, optimise the PT offer in line with user needs and patterns, involve the users in the overall mobility decision chain, trigger the behavioural change in favour of Public Transport and achieve an attractive, efficient, reliable, safe, inclusive and affordable Public Transport system in line with the concept of Mobility as a Right (MaaR)

    more_vert
  • Funder: European Commission Project Code: 875530
    Overall Budget: 36,367,600 EURFunder Contribution: 29,980,400 EUR

    SHOW aims to support the migration path towards affective and persuasive sustainable urban transport, through technical solutions, business models and priority scenarios for impact assessment, by deploying shared, connected, cooperative, electrified fleets of autonomous vehicles in coordinated Public Transport (PT), Demand Responsive Transport (DRT), Mobility as a Service (MaaS) and Logistics as a Service (LaaS) operational chains in real-life urban demonstrations in 5 Mega, 6 Satellite and 3 Follower Pilots taking place in 20 cities across Europe. By deploying a fleet of 74 L4/L5 AVs of all types (buses, shuttles, pods, robo-taxis, automated cars connected with MaaS and cargo vehicles) and for all transport operators (passengers, cargo and mixed transport) in both dedicated lanes and mixed traffic, connected to a wide range of supporting infrastructure (5G, G5, IoT, etc.) and operating under traffic speeds ranging from 18 to over 50km/h, it aims to satisfy 7 UCs families and 22 single UCs; that together cover all urban automated mobility needs and wants of the stakeholders (i.e. as reported within SPACE initiative and in ERTRAC roadmap). Project pilots will last for 24 months, with real service seamless operation in each pilot site lasting at least 12 months and will transport with AV fleets over 1,500,000 passengers and 350,000 units of goods. Being the bigger and more holistic ever real life CCAV urban demonstration initiative, it is user led (by UITP) and realised by a Consortium of 69 Partners, 6 third parties and with the additional support of 60 stakeholders (connected through LoS, including major stakeholder Associations) and twinning actions with 11 organisations the US, S. Korea, Australia, China, Taiwan and Singapore.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.