Powered by OpenAIRE graph
Found an issue? Give us feedback

VAN MOER LOGISTICS

VAN MOER GROUP
Country: Belgium

VAN MOER LOGISTICS

2 Projects, page 1 of 1
  • Funder: European Commission Project Code: 858508
    Overall Budget: 8,916,380 EURFunder Contribution: 8,916,380 EUR

    Inland Waterborne Transport (IWT) advantages as low-energy and low CO2 emitting transport mode are not fully exploited today due to gaps in the logistics system. Inland container vessels pay 6-8 calls at seaport terminals with long waiting times. More time is lost by sub-optimal navigation on rivers and waiting at bridges and locks. In addition, low load factors of containers and vessels impact the logistics systems with unnecessary high numbers of containers being transported and trips being made. NOVIMOVE strategy is to “condense” the logistics system by improving container load factors and by reducing waiting times in seaports, by improved river voyage planning and execution, and by facilitating smooth passages through bridges and locks. NOVIMOVE’s innovations are: (1) cargo reconstruction to raise container load factors, (2) mobile terminals feeding inland barges, (3) smart river navigation by merging satellite (Galileo) and real time river water depths data, (4) smooth passage through bridges/locks by dynamic scheduling system for better corridor management along the TEN-T Rhine-Alpine (R-A) route, (5) concepts for innovative vessels that can adapt to low water condition while maintaining a full payload, and (6) close cooperation with logistic stakeholders, ports and water authorities along the R-A route: Antwerp, Rotterdam, Duisburg, Basel. NOVIMOVE technology developments will be demonstrated by virtual simulation, scaled model tests and full-scale demonstrations. NOVIMOVE innovations will impact the quantity of freight moved by IWT along the R-A corridor by 30% with respect to 2010 baseline data. The NOVIMOVE 21-members consortium combines logistics operators, ports, system-developers and research organisations from 4 EU member states and two associate countries. The work plan contains 4 technical Work Packages. The project duration is four years; the requested funding is 8,9 MIO.

    more_vert
  • Funder: European Commission Project Code: 723009
    Overall Budget: 7,923,950 EURFunder Contribution: 7,923,950 EUR

    NOVIMAR aims to adjust inland/short-sea shipping such that it can make optimal use of the waterborne system of waterways, vessels and ports/terminals. To achieve this NOVIMAR introduces the waterborne version of 'platooning', the Vessel Train. This is in essence a number of unmanned Follower Ships with own sailing/manoeuvring capabilities being temporarily led by a manned Leader Ship. Vessels will be able to join and leave such trains at places adjacent to their points of origin and destination at seaside or inland. Envisaged main benefits and impacts are: Reduction of crew costs result in up to 47% total cost reduction for IWT and up to 88% crew cost reduction for short sea transport, Enhanced Logistic flexibility, 10-15 % Less energy use/emissions, Solutions for overcoming barriers between transport modes and High potential for reducing road congestion and associated costs. Lower costs increases the attractiveness of small vessels at sea and inland, hereby increasing access to urban areas located at small waterways (CEMT I/II), with no need for sizeable investments in infrastructures. SME’s benefits include enhanced competitiveness and improved working conditions for vessel owners/operators, and market opportunities for equipment suppliers. NOVIMAR technology developments include measuring, control and communication systems, and navigation aids for IWT use. NOVIMAR work structure contains 5 technical Work Packages dedicated to the Transport system, Impact assessment, Navigation, Cargo systems and vessels, and Safety and human skills issues. The consortium contains 22 partners: logistic operators, industry, public bodies and research organisations from 7 EU and 2 associated countries. The project duration is 48 months, required funding is €7,9 million.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.