Powered by OpenAIRE graph
Found an issue? Give us feedback

FLERR

Forum of European National Highway Research Laboratories
56 Projects, page 1 of 12
  • Funder: European Commission Project Code: 218742
    more_vert
  • Funder: European Commission Project Code: 213131
    more_vert
  • Funder: European Commission Project Code: 285305
    more_vert
  • Funder: European Commission Project Code: 958701
    Overall Budget: 2,512,230 EURFunder Contribution: 2,039,740 EUR

    Monitoring slope movements is becoming a crucial task in today’s societies. Natural landslides cause damages of €18 billion/year at a global scale, and around 66M people—1% of the world’s population—currently live in high-risk areas. Furthermore, this number is increasing steadily due to climate change. On the other hand, human activities such as large geotechnical constructions, a growing network of linear infrastructures and mining increase the danger of soil movement. The need for cost-effective and reliable slope monitoring technology is increasing. However, currently available slope monitoring technologies are basically reduced to manual inclinometer probes, which require the deployment of operators and equipment to take measures directly in the slope. This hampers measurements at short intervals or in remote or unstable areas. Automatic inclinometers are capable of transmitting data in real time, however they are very costly and require complex technical installations. We present ALARTE: an automatic inclinometer probe that can transmit data in real, is cost-effective and easily installed; a game-changing technology that will disrupt the market of geotechnical monitoring by closing the gap between manual and automatic monitoring options. The consortium is composed by companies covering the whole supply chain: Tecnalia (Spain), IPR and R&D, Mikrosay (Turkey) production, FEHRL (Belgium) dissemination, Sixense (France) commercialization and Ferrovial (Spain) validation. We will target monitoring service companies, geotechnical consultants, critical infrastructure operators, and the Public administration putting the focus on growing infrastructure markets: linear, energy, mining and urban engineering. We plan sale at least 3,078 ALARTE units and sign 574 monitoring service contracts. Thanks to this strategy, the project will generate €31.35 M in revenues by the fifth year of commercialization (€11.6 M cumulative profit), ROI 4.6 against total investment of €2.51 M

    more_vert
  • Funder: European Commission Project Code: 266051
    more_vert
  • chevron_left
  • 1
  • 2
  • 3
  • 4
  • 5
  • chevron_right

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.