3 Projects, page 1 of 1
  • Funder: European Commission Project Code: 101012456
    Funder Contribution: 11,147,700 EUR

    The European railway industry faces great challenges in need for increased network capacity. Ageing infrastructure assets require efficient and sustainable interventions to maintain and improve current levels of performance. To meet these demands and increase the operational performance of the railway infrastructure assets, innovation is needed to enable a step-change in reliability, availability, maintainability and safety (RAMS) and also to optimise asset capital and LCC. The IN2TRACK3 proposal addresses the topic of “Research into optimised and future railway Infrastructure” of the 2020 Horizon 2020 SHIFT2RIL call. The project is a continuation of IN2TRACK and IN2TRACK2 and aims to further develop and demonstrate research results and innovations developed. IN2TRACK3 will develop physical as well as digital technology and methodology demonstrators for the Track, Switches & Crossings and Bridge & Tunnel assets and the project is aligned to the SHIFT2RAIL overall aims. The project structure is designed around three technical sub-projects aiming at both improving the operational performance of existing infrastructure assets and providing radical new system solutions delivering a step-change in performance, improving methods and repair techniques, improve quality, reduce costs and extend the service life of assets and structures. The project is led by Trafikverket, the Swedish Transport Administration Agency, the consortium consists of 27 expert partners originating from 11 European countries and the partners involved are infrastructure managers, research partners, technology developers and industry partners. IN2TRACK3 will further develop and demonstrate a number of innovative solutions based upon the two previous projects and the work will build upon already ongoing mutually beneficial collaboration, established communication paths and a considerable amount of mutual trust built upon years of collaboration in international project environments.

    more_vert
  • Funder: European Commission Project Code: 826255
    Funder Contribution: 13,188,000 EUR

    The IN2TRACK2 proposal addresses the topic of “Research into optimised and future railway infrastructure” of the 2018 HORIZON 2020 SHIFT2RAIL Call for proposals for the Joint Undertaking Members (S2R-CFM-IP3-01-2018). IN2TRACK2 deals with rail infrastructure sub-system and covers all the works on Switch & Crossing (S&C), Track and Structures (Bridges and Tunnels) included in the SHIFT2RAIL Innovation Programme 3 (including the project IN2TRACK) and contributes to the full longer-term SHIFT2RAIL objectives. IN2TRACK2 represents the opportunity to choose some high-risk, innovative activities from the current SHIFT2RAIL work programme for development under intensive collaboration as the right path for success. IN2TRACK2 aims to reduce lifecycle costs, improve reliability and punctuality, whilst increasing capacity, enhancing interoperability and improving the customer experience. The structure of the work plan is designed around the development of a certain number of well-focused technological innovations in several areas (S&C, Track and Structures), each and all together, will contribute to achieve the desired impact at the overall railway system level. The IN2TRACK2 proposal is organised around three technical sub-projects, which are interconnected: S&C, Track and Structures. S&C activities aim at both improving the operational performance of existing S&C and providing radical new S&C system solutions that deliver a step-change in performance of the asset. The IN2TRACK2 Track activities aim at both exploring new track construction to optimise the today track system and improving the track system substantially to provide a step change in performance. The IN2TRACK 2 Bridges and Tunnels activities aim at improving methods and repair techniques to reduce costs, improve quality and extend the service life of structures. By enhancing S&C, Track and Structures, IN2TRACK2 contributes to all of the expected impacts identified in the Shift2Rail Annual Work Plan 2018.

    more_vert
  • Funder: European Commission Project Code: 730841
    Overall Budget: 2,799,990 EURFunder Contribution: 2,799,990 EUR

    Research into Enhanced Track, Switches and Structure The railway of the future needs to meet the predicted growth in societal demand in terms of capacity and service, address the environmental challenges of the 21st century, and enable the political objectives of the European Union. IN2TRACK is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that have been identified as part of the Shift2Rail Innovation Programme 3. Overall objectives of IN2TRACK are divided into three parts; Enhancing and optimising the switch & crossings and track systems in order to ensure the optimal line usage and capacity; Investigating novel ways of extending the life of bridges and tunnel assets through new approaches to maintaining, repairing and upgrading these structures; Development and adoption of a holistic, whole system-approach. A whole-system approach ,which is defined as the system boundaries extending from dynamic wheel-rail interaction (loading input) through to degradation of the S&C system, sub-systems, individual components, and underlying track foundation, will also be at the heart of IN2TRACK on how to reach the objectives. This IN2TRACK proposal addresses each of the areas identified in the H2020-S2RJU-2016-01 call. IN2TRACK is fully aligned with Shift2Rail IP3 in its objectives, approach, and ambition; addressing early enhancements and innovation opportunities.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.