Powered by OpenAIRE graph
Found an issue? Give us feedback

TALGA ADVANCED MATERIALS GMBH

Country: Germany

TALGA ADVANCED MATERIALS GMBH

2 Projects, page 1 of 1
  • Funder: European Commission Project Code: 101069508
    Overall Budget: 7,999,560 EURFunder Contribution: 7,999,560 EUR

    HighSpin aims to develop high-performing, safe and sustainable generation 3b high-voltage spinel LNMO||Si/C material, cells and modules with a short industrialisation pathway and demonstrate their application for automotive and aeronautic transport applications. The project addresses in full the scope of the HORIZON-CL5-2021-D2-01-02 topic, setting its activities in the “high-voltage” line. The project objectives are: • Further develop the LNMO||Si/C cell chemistry compared to the reference 3beLiEVe baseline, extracting its maximum performance. • Develop and manufacture LNMO||Si/C cells fit for automotive and aeronautic applications. • Design and demonstrate battery modules for automotive and aeronautic applications. • Thoroughly assess the LMNO||Si/C HighSpin technology vs. performance, recyclability, cost and TRL. The HighSpin cell delivers 390 Wh/kg and 925 Wh/l target energy density, 790 W/kg and 1,850 W/l target power density (at 2C), 2,000 deep cycles, and 90 €/kWh target cost (pack-level). The project activities encompass stabilisation of the active materials via microstructure optimisation, the development of high-voltage electrolyte formulations containing LiPF6 and LIFSI, high-speed laser-structuring of the electrodes, and the inclusion of operando sensors in the form of a chip-based Cell Management Unit (CMU). HighSpin will demonstrate TRL 6 at the battery module level, with a module-to-cell gravimetric energy density ratio of 85-to-90% (depending on the application). Recyclability is demonstrated, targeting 90% recycling efficiency at 99.9% purity. HighSpin aims at approaching the market as a second-step generation 3b LNMO||Si/C in the year 2028 (automotive) and 2030 (aeronautics), delivering above 40 GWh/year and 4 billion/year sales volume in the reference year 2030.

    more_vert
  • Funder: European Commission Project Code: 887674
    Overall Budget: 23,882,500 EURFunder Contribution: 11,628,400 EUR

    ReSolute Project aims to pave the way for the production, at full industrial scale, of novel, non-toxic and high performing solvent from wood biomass. The Chemical sector is today facing a number of challenges driving demand for higher performing and safer chemicals derived from biomass. In the meantime, in the face of declining demand for paper, the pulp and paper industry is actively exploring opportunities to diversify into new areas or business including bio-based chemicals. In response to these needs, Circa has developed, at demonstration scale, a proprietary process to produce a novel bio-paper sector. From LGO ca be derived a wide range of chemicals including solvents, specialty polymers, flavours & fragrances, pharmaceutical and agrochemical actives. Circa’s first commercial product – a novel solvent trademarked as Cyrene – has already been trialled by more than 400 compagnies and researchers across the world and, for a growing number of applications, outperforms traditional dipolar aprotic solvents such as NMP, DMF and DMAc, which are under intense regulatory pressure due to their toxicity. Building on Circa group’s unique experience gained over the last 10 years via its 4 pilots and its operating demonstration plant, one of ReSolute’s key objectives will be to build and successfully operate a first-of-its kind Flagship Cyrene plant. The biorefinery will be built in France on the Carling Saint-Avold platform site owned by Total. The Flagship plant is expected to be mainly fed with saw dust and have a nameplate capacity of 1,000 metric tonnes per year. To reach this ambitious target, ReSolute will bring together 11 key actors along the entire value chain and will look to valorize the main by-product (biochar) in the energy and activated carbon markets.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.