Powered by OpenAIRE graph
Found an issue? Give us feedback

CRAYONANO AS

Country: Norway
5 Projects, page 1 of 1
  • Funder: European Commission Project Code: 881603
    Overall Budget: 150,000,000 EURFunder Contribution: 150,000,000 EUR

    This proposal describes the third core project of the Graphene Flagship. It forms the fourth phase of the FET flagship and is characterized by a continued transition towards higher technology readiness levels, without jeopardizing our strong commitment to fundamental research. Compared to the second core project, this phase includes a substantial increase in the market-motivated technological spearhead projects, which account for about 30% of the overall budget. The broader fundamental and applied research themes are pursued by 15 work packages and supported by four work packages on innovation, industrialization, dissemination and management. The consortium that is involved in this project includes over 150 academic and industrial partners in over 20 European countries.

    more_vert
  • Funder: European Commission Project Code: 969264
    Overall Budget: 3,433,120 EURFunder Contribution: 2,403,190 EUR

    UVC light is the safest, quickest and most effective way to kill disease-causing bacteria and viruses. UVC LEDs are a promising technology which can make chemical-free disinfection possible thanks to their efficiency, long-lasting and compact design. Despite their potential, they remain a niche solution because they face key bottlenecks which prevent them from having a good enough cost-performance (defined as euro/watt) for a consumer market. CrayoNano has developed a completely new UVC LED called SteriLED which will reach these cost-performance targets for the first time, backed by a growing portfolio of market and industry players. We have achieved what leading LED manufacturers have not thanks to our radical new processing technique protected by over 14 patent families. The core technology of SteriLED are core nanowires of the semiconductor AlGaN grown on a substrate of a promising new material, graphene. Thanks to the properties of these two nanomaterials, SteriLED emits 3X more light, has a 3X longer lifetime at one fourth of the costs of standard UVC LEDs. Our strategy to bring SteriLED quickly to the market at the beginning of 2022 is to manufacture them for sales to the OEMs of point of use (POU) water purification devices. SteriLED fits seamlessly into these devices to treat water at the point of consumption to transform them into the most practical, dependable, potent and inexpensive systems on the market. The first successes of SteriLED will be only a stepping stone for its rapid improvement of its cost-performance reduction and its development for new applications from high volume purification systems for water, surface and air disinfection, eliminating the need for thousands of toxic chemicals.

    more_vert
  • Funder: European Commission Project Code: 696656
    Overall Budget: 89,000,000 EURFunder Contribution: 89,000,000 EUR

    This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CSA) under the 7th framework program (2013-2016), while this and the following parts are implemented as Core Projects under the Horizon 2020 framework. The mission of the Graphene Flagship is to take graphene and related layered materials from a state of raw potential to a point where they can revolutionise multiple industries. This will bring a new dimension to future technology – a faster, thinner, stronger, flexible, and broadband revolution. Our program will put Europe firmly at the heart of the process, with a manifold return on the EU investment, both in terms of technological innovation and economic growth. To realise this vision, we have brought together a larger European consortium with about 150 partners in 23 countries. The partners represent academia, research institutes and industries, which work closely together in 15 technical work packages and five supporting work packages covering the entire value chain from materials to components and systems. As time progresses, the centre of gravity of the Flagship moves towards applications, which is reflected in the increasing importance of the higher - system - levels of the value chain. In this first core project the main focus is on components and initial system level tasks. The first core project is divided into 4 divisions, which in turn comprise 3 to 5 work packages on related topics. A fifth, external division acts as a link to the parts of the Flagship that are funded by the member states and associated countries, or by other funding sources. This creates a collaborative framework for the entire Flagship.

    more_vert
  • Funder: European Commission Project Code: 785219
    Overall Budget: 88,000,000 EURFunder Contribution: 88,000,000 EUR

    This proposal describes the third stage of the EC-funded part of the Graphene Flagship. It builds upon the results achieved in the ramp-up phase (2013 - 2016) and the first core project (2016 - 2018), and covers the period April 2018 - March 2020. The progress of the flagship follows the general plans set out in the Framework Partnership Agreement, and the second core project represents an additional step towards higher technology and manufacturing readiness levels. The Flagship is built upon the concept of value chains, one of which is along the axis of materials-components-systems; the ramp-up phase placed substantial resources on the development of materials production technologies, the first core project moved to emphasise components, and the second core project will move further towards integrating components in larger systems. This evolution is manifested, e.g., in the introduction of six market-motivated spearhead projects during the Core 2 project.

    more_vert
  • Funder: European Commission Project Code: 952792
    Overall Budget: 20,000,000 EURFunder Contribution: 20,000,000 EUR

    The 2D Experimental Pilot Line (2D-EPL) project will establish a European ecosystem for prototype production of Graphene and Related Materials (GRM) based electronics, photonics and sensors. The project will cover the whole value chain including tool manufacturers, chemical and material providers and pilot lines to offer prototyping services to companies, research centers and academics. The 2D-EPL targets to the adoption of GRM integration by commercial semiconductor foundries and integrated device manufacturers through technology transfer and licensing. The project is built on two pillars. In Pillar 1, the 2D-EPL will offer prototyping services for 150 and 200 mm wafers, based on the current state of the art graphene device manufacturing and integration techniques. This will ensure external users and customers are served by the 2D-EPL early in the project and guarantees the inclusion of their input in the development of the final processes by providing the specifications on required device layouts, materials and device performances. In Pillar 2, the consortium will develop a fully automated process flow on 200 and 300 mm wafers, including the growth and vacuum transfer of single crystalline graphene and TMDCs. The knowledge gained in Pillar 2 will be transferred to Pillar 1 to continuously improve the baseline process provided by the 2D-EPL. To ensure sustainability of the 2D-EPL service after the project duration, integration with EUROPRACTICE consortium will be prepared. It provides for the European actors a platform to develop smart integrated systems, from advanced prototype design to small volume production. In addition, for the efficiency of the industrial exploitation, an Industrial Advisory Board consisting mainly of leading European semiconductor manufacturers and foundries will closely track and advise the progress of the 2D-EPL. This approach will enable European players to take the lead in this emerging field of technology.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.