Powered by OpenAIRE graph
Found an issue? Give us feedback

PCM PRODUC

PHASE CHANGE MATERIAL PRODUCTS LTD
Country: United Kingdom
12 Projects, page 1 of 3
  • Funder: European Commission Project Code: 778143
    Overall Budget: 71,429 EURFunder Contribution: 50,000 EUR

    TubeICE project deals with the design, industrialization and commercialization of an innovative Phase Change Material (PCM) tubular shaped PTES unit, able to store energy within the range 22-27°C. TubeICE unit is composed by a pipe shell where a Positive Temperature Eutectic solutions is packed: in summer, the storage unit exploits the temperature gradient between night and days, being charged during the night (when temperature is lower) thanks to the solidification of the PCM and discharged during the day by the liquefaction of the material, thus allowing a reduction of air conditioning energy consumption; in winter, TubeICE increases the thermal inertia of the building, being charged through material liquefaction when thermal energy is available. The technology developed and proposed by PCMPro delivers breakthrough properties: • thanks to the development of the innovative PCM and to a compact innovative design, the energy density is 73 kWh/m3, much higher than competing technologies; • installing the storage unit on the ceiling area, 12 tubes can be packed per m2 using standard 50mm pipe brackets, giving a storage of 1.74 kWh/m2; • the application of an eutectic alloy leads to a constant charging and discharging temperature, with benefits in terms of conditioning quality and easiness in storage management; • as already demonstrated by the first pilot installations in a number of offices/shops and in an educational facility located at Coventry in U.K., the integration of TubeICE leads to a global energy consumption reduction within the range 10-40% depending on the location and the building properties, thanks to the maximization of free-cooling (and the consequent reduction of energy intensive mechanical cooling) and to the nighttime free storage. • TubeICE is maintenance free and assures a long durability (10 years and more).

    more_vert
  • Funder: European Commission Project Code: 603392
    more_vert
  • Funder: European Commission Project Code: 262285
    more_vert
  • Funder: European Commission Project Code: 296006
    more_vert
  • Funder: European Commission Project Code: 260056
    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.