Powered by OpenAIRE graph
Found an issue? Give us feedback

METABUILD GMBH

Country: Germany

METABUILD GMBH

2 Projects, page 1 of 1
  • Funder: European Commission Project Code: 101136112
    Overall Budget: 9,627,000 EURFunder Contribution: 8,008,850 EUR

    INCREASE aims to contribute to a wider uptake of IPV by delivering innovations at module and system level, as well as for the design & operation phase. New encapsulants and coatings will be developed contributing to improved aesthetics, reduced glare, lower environmental footprint, improved behavior during fire, and improved antifoiling and antisoiling behavior. At system level, innovations focus on integrated facade and roof concepts, as well as noise barriers. Practical guidelines will further be delivered for bespoke infrastructure integrated projects, validated with a variety of complementary infrastructure integrated PV projects. Elaborate testing is foreseen at module and system level in line with relevant construction related and electrical standards. Optimal case-specific selection of IPV size and characteristics will be supported by a multi-objective optimisation software that takes into account the shape and use of the building or infrastructure, its surroundings, and its energy flexibility potential and steer the asset operation as well as suggest specific user behaviour to maximise the self-consumption. To increase market acceptance, a strong layer of user feedback and co-creation underpins the overall R&D activities, and contributes to delivering 10 complementary building and infrastructure demonstrations on 9 locations in 6 European countries. Cross-sector interactions, policy exchanges, investor dialogues, and country-specific business case assessments will further direct the exploitation towards large scale market uptake.

    more_vert
  • Funder: European Commission Project Code: 820553
    Overall Budget: 6,997,780 EURFunder Contribution: 6,997,780 EUR

    ‘BIM for renovation of existing residential building stock’ has been proven viable in innovative pilot projects by the members of BIM-SPEED consortium, among others in H2020 Smart Cities. The mission of BIM-SPEED is to take ‘BIM for renovation’ to a deep renovation level for at least 60% energy saving, and to accelerate the market uptake across the EU. In line with its mission, BIM-SPEED aims to enable all stakeholders to adopt BIM to reduce the time of deep renovation projects by at least 30% by providing them with: 1) an affordable BIM cloud platform, 2) a set of inter-operable BIM tools, and 3) standardised procedures for As-Built data acquisition, modelling, simulation, implementation and maintenance of renovation solutions. BIM-SPEED relies on a trans-disciplinary approach comprising (i) process, (ii) ICT, and (iii) social innovation with a special attention to the stakeholders as a key success factor for BIM adoption. The interoperability of a full range of BIM tools for renovation will be accommodated on an innovative BIM cloud platform, which will be launched and available free-of-charge for all stakeholders immediately from the beginning of the BIM-SPEED project. BIM-SPEED will engineer the seamless integration and quick installation of building and HVAC products for renovation into the existing buildings. Such Plug-and-Play solutions are crucial for the overall time reduction. BIM-SPEED consortium represents all players in the renovation market. Throughout a 4-year project duration, BIM-SPEED will demonstrate the holistic solution in 12 real demonstration cases. An EU-wide BIM Competition will be jointly organised by the European umbrella organisations in all disciplines (architects, HVAC engineers and construction firms) to kick-off the first market replication in more than 200 BIM-based renovation projects. BIM-SPEED will benefit from the membership of buildingSMART standardisation platform and the EU BIM Task Group to harmonize best EU practices.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.