Powered by OpenAIRE graph
Found an issue? Give us feedback

LANKHORST ENGINEERED PRODUCTS BV

Country: Netherlands

LANKHORST ENGINEERED PRODUCTS BV

1 Projects, page 1 of 1
  • Funder: European Commission Project Code: 101014571
    Overall Budget: 1,349,970 EURFunder Contribution: 1,349,970 EUR

    IN2ZONE will design and test a prototype next generation transition zone solution that provides a step-change in track support conditions, resulting in a reduction in maintenance interventions. The new solution will combine the newest existing transition solutions with technological advances from other sectors, including recent advances in material science. This interdisciplinary approach will improve both the track super-structure and sub-structure designs, thus ensuring the whole system stiffness is optimised. To increase lifespan, advanced automatic irregularity correcting sleepers will be designed, that are synthetic and optimised for transition zones. This will enable the transition zone solution to self-correct minor vertical track geometry irregularities/faults. Further, the solution architecture will be modular to ensure the benefits are realised in minimal time. The new design will be optimised using the latest advances in discrete and finite element numerical simulation tools, coupled with computational fluid dynamics. The concept will then be constructed and tested at large-scale in an accelerated track testing laboratory facility. This gives a rare and valuable opportunity to develop and test the transition zone solution installation, maintenance and decommissioning, while also assessing long-term settlement behaviour. In addition to the new design, an advanced resilience-based monitoring specification for transition zones will be developed, which will fuse data from multiple track, vehicle and satellite sensors, using edge computing and artificial intelligence to achieve an Industry 4.0 approach for just-in-time maintenance. IN2ZONE’s pan-European consortium comprises 7 stakeholders covering all areas of expertise necessary to execute the project, including three companies, two research Universities, one Infrastructure Manager and one Rail Association.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.