Powered by OpenAIRE graph
Found an issue? Give us feedback

SAARSTAHL RAIL SAS

Country: France

SAARSTAHL RAIL SAS

3 Projects, page 1 of 1
  • Funder: European Commission Project Code: 635900
    Overall Budget: 17,998,500 EURFunder Contribution: 17,998,500 EUR

    IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineering are integrated, optimised, shared and exploited. IN2RAIL will make advances towards SHIFT2RAIL objectives: enhancing the existing capacity fulfilling user demand; increasing the reliability delivering better and consistent quality of service; reducing the LCC increasing competitiveness of the EU rail system. To achieve the above, a holistic approach covering Smart Infrastructures, Intelligent Mobility Management (I2M)and Rail Power Supply and Energy Management will be applied. Smart Infrastructure addresses the fundamental design of critical assets - switches and crossings and tracks. It will research components capable of meeting future railway demands and will utilise modern technologies in the process. Risk and condition-based LEAN approaches to optimise RAMS and LCC in asset maintenance activities will be created to tackle the root causes of degradation. I2M researches automated, interoperable and inter-connected advanced traffic management systems; scalable and upgradable systems, utilising standardised products and interfaces, enabling easy migration from legacy systems; the wealth of data and information on assets and traffic status; information management systems adding the capability of nowcasting and forecasting of critical asset statuses. Rail Power Supply and Energy Management create solutions to improve the energy performance of the railway system. Research on new power systems characterised by reduced losses and capable of balancing energy demands, along with innovative energy management systems enabling accurate and precise estimates of energy flows.

    more_vert
  • Funder: European Commission Project Code: 730841
    Overall Budget: 2,799,990 EURFunder Contribution: 2,799,990 EUR

    Research into Enhanced Track, Switches and Structure The railway of the future needs to meet the predicted growth in societal demand in terms of capacity and service, address the environmental challenges of the 21st century, and enable the political objectives of the European Union. IN2TRACK is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that have been identified as part of the Shift2Rail Innovation Programme 3. Overall objectives of IN2TRACK are divided into three parts; Enhancing and optimising the switch & crossings and track systems in order to ensure the optimal line usage and capacity; Investigating novel ways of extending the life of bridges and tunnel assets through new approaches to maintaining, repairing and upgrading these structures; Development and adoption of a holistic, whole system-approach. A whole-system approach ,which is defined as the system boundaries extending from dynamic wheel-rail interaction (loading input) through to degradation of the S&C system, sub-systems, individual components, and underlying track foundation, will also be at the heart of IN2TRACK on how to reach the objectives. This IN2TRACK proposal addresses each of the areas identified in the H2020-S2RJU-2016-01 call. IN2TRACK is fully aligned with Shift2Rail IP3 in its objectives, approach, and ambition; addressing early enhancements and innovation opportunities.

    more_vert
  • Funder: European Commission Project Code: 826255
    Funder Contribution: 13,188,000 EUR

    The IN2TRACK2 proposal addresses the topic of “Research into optimised and future railway infrastructure” of the 2018 HORIZON 2020 SHIFT2RAIL Call for proposals for the Joint Undertaking Members (S2R-CFM-IP3-01-2018). IN2TRACK2 deals with rail infrastructure sub-system and covers all the works on Switch & Crossing (S&C), Track and Structures (Bridges and Tunnels) included in the SHIFT2RAIL Innovation Programme 3 (including the project IN2TRACK) and contributes to the full longer-term SHIFT2RAIL objectives. IN2TRACK2 represents the opportunity to choose some high-risk, innovative activities from the current SHIFT2RAIL work programme for development under intensive collaboration as the right path for success. IN2TRACK2 aims to reduce lifecycle costs, improve reliability and punctuality, whilst increasing capacity, enhancing interoperability and improving the customer experience. The structure of the work plan is designed around the development of a certain number of well-focused technological innovations in several areas (S&C, Track and Structures), each and all together, will contribute to achieve the desired impact at the overall railway system level. The IN2TRACK2 proposal is organised around three technical sub-projects, which are interconnected: S&C, Track and Structures. S&C activities aim at both improving the operational performance of existing S&C and providing radical new S&C system solutions that deliver a step-change in performance of the asset. The IN2TRACK2 Track activities aim at both exploring new track construction to optimise the today track system and improving the track system substantially to provide a step change in performance. The IN2TRACK 2 Bridges and Tunnels activities aim at improving methods and repair techniques to reduce costs, improve quality and extend the service life of structures. By enhancing S&C, Track and Structures, IN2TRACK2 contributes to all of the expected impacts identified in the Shift2Rail Annual Work Plan 2018.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.