Powered by OpenAIRE graph
Found an issue? Give us feedback

CARISMAND

Culture And RISkmanagement in Man-made And Natural Disasters
Funder: European CommissionProject code: 653748 Call for proposal: H2020-DRS-2014
Funded under: H2020 | CSA Overall Budget: 3,788,530 EURFunder Contribution: 3,788,530 EUR
visibility
downloads
views
OpenAIRE UsageCountsViews provided by UsageCounts
downloads
OpenAIRE UsageCountsDownloads provided by UsageCounts
19
44
Description

As risks are not “objective” but socially and culturally constructed, disaster management which is aware, respects, and makes use of local cultural aspects will be not only more effective but, at the same time, also improve the community’s disaster coping capacities. CARISMAND is setting out to identify these factors, to explore existing gaps and opportunities for improvement of disaster policies and procedures, and to develop a comprehensive toolkit which will allow professional as well as voluntary disaster managers to adopt culturally-aware everyday practices. This goal will be achieved by approaching the links, and gaps, between disaster management, culture and risk perception from the broadest possible multi-disciplinary perspective and, simultaneously, developing a feedback-loop between disaster management stakeholders and citizens to establish, test, and refine proposed solutions for culturally-informed best practices in disaster management. Whilst experts from a variety of fields (in particular legal, IT, cognitive science, anthropology, psychology, sociology) will undertake a comprehensive collation of existing knowledge and structures, a number of Citizen Summits and Stakeholder Assemblies will be organised. Systematically, CARISMAND will use an approach that examines natural, man-made and technical disasters, placing at the centre of attention specific aspects that affect culturally informed risk perceptions, eg whether disasters are caused intentionally or not, the different “visibility” of hazards, and various time scales of disasters such as slow/fast onset and short- and long-term effects. By organising six Citizen Summits (two per disaster category per year in two separate locations) where such disaster risks are prevalent , and three Stakeholder Assemblies (one per year) where the results are discussed through a wide cross-sectional knowledge transfer between disaster managers from different locations as well as from different cultural backgrounds.

Data Management Plans
  • OpenAIRE UsageCounts
    Usage byUsageCounts
    visibility views 19
    downloads downloads 44
  • 19
    views
    44
    downloads
    Powered byOpenAIRE UsageCounts
Powered by OpenAIRE graph
Found an issue? Give us feedback

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

All Research products
arrow_drop_down
<script type="text/javascript">
<!--
document.write('<div id="oa_widget"></div>');
document.write('<script type="text/javascript" src="https://beta.openaire.eu/index.php?option=com_openaire&view=widget&format=raw&projectId=corda__h2020::7ab7f98186a1782cdb3943bc83a0c28b&type=result"></script>');
-->
</script>
For further information contact us at helpdesk@openaire.eu

No option selected
arrow_drop_down