Modeling of photovoltaic power uncertainties for impact analysis on generation scheduling and cost of an urban micro grid

Abstract In electrical systems, the main objective is to satisfy the load demand at the least cost without having imbalance between generation and consumption. Thus, the uncertainty of photovoltaic (PV) power production must be considered in generation planning of a power system. In this paper, we develop a modeling method of this uncertainty to consider it into the generation scheduling. The optimal generation scheduling in an urban microgrid is made by taking in consideration the operating reserve provision under stochastic characteristics of PV power prediction. By considering a prescribed risk level of unbalancing, a dynamic programming algorithm sets the operational planning of conventional generators by solving a non-convex mixed-integer nonlinear programming model, so that the operational cost and available operating reserve can be calculated. Then, the effect of PV power uncertainty into the unit commitment is analyzed by considering PV forecast intervals with a 95 % confidence level. The unit commitment is then recalculated with new generator set points and the same criteria. Finally, variations of the targeted minimized costs and obtained OR is analyzed according to the uncertainty.
- University of Lille France
- Laboratoire d'Électrotechnique et d'Électronique de Puissance de Lille France
- ParisTech France
- Institut Polytechnique de Bordeaux France
- ParisTech France
[SPI.NRJ]Engineering Sciences [physics]/Electric power, Uncertainty, Operating reserve, Dynamic programming, Unit commitment, Micro grid, [SPI.NRJ] Engineering Sciences [physics]/Electric power
[SPI.NRJ]Engineering Sciences [physics]/Electric power, Uncertainty, Operating reserve, Dynamic programming, Unit commitment, Micro grid, [SPI.NRJ] Engineering Sciences [physics]/Electric power
citations This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).14 popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.Top 10% influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).Top 10% impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.Top 10%