Reducing stranded assets through early action in the Indian power sector

handle: 2433/255255 , 11718/25358
Abstract Cost-effective achievement of the Paris Agreement’s long-term goals requires the unanimous phase-out of coal power generation by mid-century. However, continued investments in coal power plants will make this transition difficult. India is one of the major countries with significant under construction and planned increase in coal power capacity. To ascertain the likelihood and consequences of the continued expansion of coal power for India’s future mitigation options, we use harmonised scenario results from national and global models along with projections from various government reports. Both these approaches estimate that coal capacity is expected to increase until 2030, along with rapid developments in wind and solar power. However, coal capacity stranding of the order of 133–237 GW needs to occur after 2030 if India were to pursue an ambitious climate policy in line with a well-below 2 °C target. Earlier policy strengthening starting after 2020 can reduce stranded assets (14–159 GW) but brings with it political economy and renewable expansion challenges. We conclude that a policy limiting coal plants to those under construction combined with higher solar targets could be politically feasible, prevent significant stranded capacity, and allow higher mitigation ambition in the future.
330, Science, QC1-999, 590, India, Environmental technology. Sanitary engineering, 950, power, SDG 13 - Climate Action, GE1-350, SDG 7 - Affordable and Clean Energy, stranded assets, TD1-1066, General Environmental Science, coal, Nationally determined contribution (ndc), Renewable Energy, Sustainability and the Environment, carbon lock-in, Physics, Q, Public Health, Environmental and Occupational Health, Stranded assets, climate policy, 320, Horizon 2020 Framework Programme, Environmental sciences, Nationally determined contribution (NDC), Coal, Climate policy, Power, Carbon lock-in
330, Science, QC1-999, 590, India, Environmental technology. Sanitary engineering, 950, power, SDG 13 - Climate Action, GE1-350, SDG 7 - Affordable and Clean Energy, stranded assets, TD1-1066, General Environmental Science, coal, Nationally determined contribution (ndc), Renewable Energy, Sustainability and the Environment, carbon lock-in, Physics, Q, Public Health, Environmental and Occupational Health, Stranded assets, climate policy, 320, Horizon 2020 Framework Programme, Environmental sciences, Nationally determined contribution (NDC), Coal, Climate policy, Power, Carbon lock-in
citations This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).29 popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.Top 10% influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).Top 10% impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.Top 10% visibility views 4 - 4views
Data source Views Downloads ZENODO 4 0