
You have already added 0 works in your ORCID record related to the merged Research product.
You have already added 0 works in your ORCID record related to the merged Research product.
<script type="text/javascript">
<!--
document.write('<div id="oa_widget"></div>');
document.write('<script type="text/javascript" src="https://beta.openaire.eu/index.php?option=com_openaire&view=widget&format=raw&projectId=undefined&type=result"></script>');
-->
</script>
As-Built Performance of Net-Zero Energy, Emissions, and Cost Buildings: A Real-Life Case Study in Melbourne, Australia

This research investigated the real-world operational performance of five purposely designed and built net-zero-energy houses in Melbourne, Australia. The embodied energy and carbon emissions of these houses were calculated based on their architectural and engineering drawings, as well as the relevant databases of embodied energy and emission factors. Operational data, including solar production, consumption, end uses, battery usage, grid import, and grid export, were measured using the appropriate IoT devices from May 2023 to April 2024. The results showed that all the studied houses achieved net-zero energy and net-zero carbon status for operation, exporting between 3 to 37 times more energy than they consumed to the grid (except for house 2, where the consumption from the grid was zero). The embodied carbon of each case study house was calculated as 13.1 tons of CO2-e, which could be paid back within 4 to 9 years depending on the operational carbon. Achieving net-zero cost status, however, was found to be difficult due to the higher electricity purchase price, daily connection charge, and lower feed-in tariff. Only house 2 was close to achieving net zero cost with only AUD 37 out-of-pocket cost. Increasing the energy exported to the grid and storing the generated solar energy may help achieve net-zero cost. The installation of batteries did not affect the net-zero energy or emission status but had a significant impact on net-zero operational costs. However, the calculated payback period for the batteries installed in these five houses ranged from 43 to 112 years, making them impractical at this stage compared to the typical 10-year warranty period of the batteries. With rising electricity purchase prices, decreasing feed-in tariffs (potentially to zero in the future/already the case in some areas), and government incentives for battery installation, the payback period could be reduced, justifying their adoption. Moreover, the installed 13.5 kWh Tesla battery was too big for households with lower energy consumption like houses 2 and 5, which used only 25% of their total battery capacity most of the year. Therefore, selecting an appropriately sized battery based on household consumption could further help reduce the payback period.
- Swinburne University of Technology Australia
- Swinburne University of Technology Australia
Building construction, net-zero energy, building operational performance, net-zero cost, embodied energy, Tesla Powerwall 2.0 battery, net-zero emission, TH1-9745
Building construction, net-zero energy, building operational performance, net-zero cost, embodied energy, Tesla Powerwall 2.0 battery, net-zero emission, TH1-9745
citations This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).0 popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.Average influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).Average impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.Average
