
You have already added 0 works in your ORCID record related to the merged Research product.
You have already added 0 works in your ORCID record related to the merged Research product.
<script type="text/javascript">
<!--
document.write('<div id="oa_widget"></div>');
document.write('<script type="text/javascript" src="https://beta.openaire.eu/index.php?option=com_openaire&view=widget&format=raw&projectId=undefined&type=result"></script>');
-->
</script>
Strategy for Optimal Grid Planning and System Evaluation of Networked Distribution Systems

doi: 10.3390/su14010304
The meshed network may become a standard for future distribution systems owing to its various benefits regarding voltage profile, reliability, losses, and the distributed generation (DG). Therefore, in Korea, there is a plan to introduce an advanced form of meshed network called a networked distribution system (NDS). This refers to a system with permanent linkages between four distribution lines (DLs) and N×N communication-based protection. To properly introduce NDS to an actual grid, this study proposes a strategy for optimal grid planning and system evaluation. Four different topologies and four practical indicators are explained. First, load imbalance is used to find the optimal grid that maximizes the load capacity. Second, line overload, fault current, and temporary overvoltage (TOV) were used to evaluate the necessity of load transfer, availability of circuit breakers, relay settings, and system stability. PSCAD/EMTDC were employed for the simulation. This study establishes the construction and evaluation guidelines of NDS for distribution system operators (DSOs).
- Korea University Korea (Republic of)
- Korea University Korea (Republic of)
- Korea University Korea (Republic of)
- Korea University Korea (Republic of)
temporary overvoltage (TOV), Environmental effects of industries and plants, fault current level, meshed network, load imbalance, TJ807-830, TD194-195, Renewable energy sources, Environmental sciences, meshed network; networked distribution system (NDS); load imbalance; line overload; fault current level; temporary overvoltage (TOV), networked distribution system (NDS), GE1-350, line overload
temporary overvoltage (TOV), Environmental effects of industries and plants, fault current level, meshed network, load imbalance, TJ807-830, TD194-195, Renewable energy sources, Environmental sciences, meshed network; networked distribution system (NDS); load imbalance; line overload; fault current level; temporary overvoltage (TOV), networked distribution system (NDS), GE1-350, line overload
citations This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).3 popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.Top 10% influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).Average impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.Average
