
You have already added 0 works in your ORCID record related to the merged Research product.
You have already added 0 works in your ORCID record related to the merged Research product.
<script type="text/javascript">
<!--
document.write('<div id="oa_widget"></div>');
document.write('<script type="text/javascript" src="https://beta.openaire.eu/index.php?option=com_openaire&view=widget&format=raw&projectId=undefined&type=result"></script>');
-->
</script>
A Mathematical Model of Intermittent Gas Lift in Elevation-Production Operation with Line-Pack and Line-Drafting Phenomena in a Gas Line

A Mathematical Model of Intermittent Gas Lift in Elevation-Production Operation with Line-Pack and Line-Drafting Phenomena in a Gas Line
This paper discusses a transient model of the intermittent gas lift technique in an oil well. The model is developed in the gas line, in the tubing-casing annulus, and the tubing. The line-pack and line-drafting phenomena in the gas line are considered in the model. A numerical approach will be used to solve the mathematical model that represents fluid flow during intermittent gas lift injection. The dynamics of important variables in the intermittent gas lift are investigated and analyzed to determine the best production strategy for intermittent gas lift. The variables are film thickness and velocity, slug height and velocity, and gas height and velocity. The relationships between surface injection control parameters (gas injection pressure and gas injection rate) and the velocity and height of film, gas, and liquid are shown in one cycle of the gas lift intermittent process. The higher the gas injection pressure, the faster the gas injection velocity, and the thinner the film thickness in the tubing. In order to obtain clean tubing from film thickness, the gas injection pressure needs to be optimized, which will lead to maintaining compressor discharge pressure availability. Detailed observation of the dynamic performance inside the tubing production well will give the optimum oil production rate for oil wells under a gas lift intermittent production strategy for field application.
- Bandung Institute of Technology Indonesia
- Universitas Pertamina Indonesia
- Pertamina Indonesia
- Pertamina Indonesia
- Universitas Pertamina Indonesia
design intermittent gas lift, QE1-996.5, transient model, Geology, line-pack, line-drafting, intermittent gas-lift, dynamics of variables
design intermittent gas lift, QE1-996.5, transient model, Geology, line-pack, line-drafting, intermittent gas-lift, dynamics of variables
2 Research products, page 1 of 1
- 2017IsAmongTopNSimilarDocuments
- 2014IsAmongTopNSimilarDocuments
citations This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).0 popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.Average influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).Average impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.Average
