
You have already added 0 works in your ORCID record related to the merged Research product.
You have already added 0 works in your ORCID record related to the merged Research product.
<script type="text/javascript">
<!--
document.write('<div id="oa_widget"></div>');
document.write('<script type="text/javascript" src="https://beta.openaire.eu/index.php?option=com_openaire&view=widget&format=raw&projectId=undefined&type=result"></script>');
-->
</script>
Application of CVaR risk aversion approach in the dynamical scheduling optimization model for virtual power plant connected with wind-photovoltaic-energy storage system with uncertainties and demand response

Application of CVaR risk aversion approach in the dynamical scheduling optimization model for virtual power plant connected with wind-photovoltaic-energy storage system with uncertainties and demand response
Conditional value at risk (CVaR) and confidence degree theory are introduced to build scheduling model for VPP connecting with wind power plant (WPP), photovoltaic generators (PV), convention gas turbine (CGT), energy storage systems (ESSs) and incentive-based demand response (IBDR). Latin hypercube sampling method and Kantorovich distance are introduced to construct uncertainties analysis method. A risk aversion scheduling model is proposed with minimum CVaR objective considering maximum operation revenue. The IEEE30 bus system is used as simulation system. Results show: (1) Price-based demand response could realize peak load shifting, ESSs and IBDR could increase operation revenue. (2) Threshold α reflects risk attitude of decision maker, which has strong risk tolerant to gain the excess income with low α. (3) In peak period, decision maker would reduce WPP and PV for avoiding power shortage loss. Otherwise, WPP and PV would be called in priority since system reserve capacity is sufficient. (4) When 0.85≤β < 0.95, the decreasing slope of CVaR value is big, decision maker is sensitive on risk. When β≥0.95, VPP scheduling scheme reach the most conservative, net revenue and CVaR value are ¥8995.34 and ¥18834. Therefore, the proposed model could describe VPP risk and provide decision support tool for decision maker.
- North China Electric Power University China (People's Republic of)
- North China Electric Power University China (People's Republic of)
16 Research products, page 1 of 2
- 2015IsAmongTopNSimilarDocuments
- 2019IsAmongTopNSimilarDocuments
- 2020IsAmongTopNSimilarDocuments
- 2016IsAmongTopNSimilarDocuments
- 2016IsAmongTopNSimilarDocuments
- 2017IsAmongTopNSimilarDocuments
- 2017IsAmongTopNSimilarDocuments
- 2000IsAmongTopNSimilarDocuments
chevron_left - 1
- 2
chevron_right
citations This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).121 popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.Top 1% influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).Top 10% impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.Top 1%
