Powered by OpenAIRE graph
Found an issue? Give us feedback
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/ Sustainabilityarrow_drop_down
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/
Sustainability
Article . 2022 . Peer-reviewed
License: CC BY
Data sources: Crossref
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/
Sustainability
Article . 2022
Data sources: DOAJ
versions View all 3 versions
addClaim

This Research product is the result of merged Research products in OpenAIRE.

You have already added 0 works in your ORCID record related to the merged Research product.

Analyzing Health, Safety, and Environmental Risks of Construction Projects Using the Fuzzy Analytic Hierarchy Process: A Field Study Based on a Project Management Body of Knowledge

Authors: Ahmad Soltanzadeh; Mohsen Mahdinia; Alireza Omidi Oskouei; Ehsan Jafarinia; Esmaeil Zarei; Mohsen Sadeghi-Yarandi;

Analyzing Health, Safety, and Environmental Risks of Construction Projects Using the Fuzzy Analytic Hierarchy Process: A Field Study Based on a Project Management Body of Knowledge

Abstract

Due to their unique nature, construction projects are considered one of the world’s most hazardous and incident-prone industrial sectors. The present study aimed to analyze health, safety and environmental (HSE) risks relating to construction projects based on the project management body of knowledge (PMBOK) and sustainability approach. This study was conducted with the participation of 30 experts, using the semi-quantitative risk assessment technique, in nine areas of the project management’s body of knowledge, based on the fuzzy analytic hierarchy process. Risk, in this study, was estimated using a two-dimensional matrix of incident probability and severity, each of which has four sub-parameters. The HSE risks pertaining to each of the nine areas of PMBOK were identified. After that, the two dimensions of risk, including incident probability and severity, were measured. Thirty-seven risk sources associated with nine areas of the PMBOK were identified. Risk analysis revealed that 20 sources were at an unacceptable risk level, and 17 risks were at a tolerable risk level. Identifying HSE-related risk sources in accordance with the nine areas of PMBOK, and using FAHP to assess the risk of these hazards in construction projects, can lead to a more realistic estimate of risk in construction projects. The presented method in the current study can create a novel perspective in terms of the construction industry’s risk management and assessment.

Related Organizations
Keywords

safety, Environmental effects of industries and plants, TJ807-830, sustainability, TD194-195, Renewable energy sources, Environmental sciences, fuzzy analytic hierarchy process, construction project; risk; project management body of knowledge; safety; sustainability; fuzzy analytic hierarchy process, GE1-350, construction project, project management body of knowledge, risk

  • BIP!
    Impact byBIP!
    citations
    This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    14
    popularity
    This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
    Top 10%
    influence
    This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    Average
    impulse
    This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
    Top 10%
Powered by OpenAIRE graph
Found an issue? Give us feedback
citations
This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Citations provided by BIP!
popularity
This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
BIP!Popularity provided by BIP!
influence
This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Influence provided by BIP!
impulse
This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
BIP!Impulse provided by BIP!
14
Top 10%
Average
Top 10%
gold