Powered by OpenAIRE graph
Found an issue? Give us feedback
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/ River Research and A...arrow_drop_down
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/
image/svg+xml Jakob Voss, based on art designer at PLoS, modified by Wikipedia users Nina and Beao Closed Access logo, derived from PLoS Open Access logo. This version with transparent background. http://commons.wikimedia.org/wiki/File:Closed_Access_logo_transparent.svg Jakob Voss, based on art designer at PLoS, modified by Wikipedia users Nina and Beao
River Research and Applications
Article . 2016 . Peer-reviewed
License: Wiley TDM
Data sources: Crossref
versions View all 3 versions
addClaim

This Research product is the result of merged Research products in OpenAIRE.

You have already added 0 works in your ORCID record related to the merged Research product.

Effect of Proposed Large Dams on Water Flows and Hydropower Production in the Sekong, Sesan and Srepok Rivers of the Mekong Basin

Impact of Large Dams in Tributaries of the Mekong
Authors: Mauricio E. Arias; Mauricio E. Arias; Thomas A. Cochrane; Thanapon Piman; Thanapon Piman;

Effect of Proposed Large Dams on Water Flows and Hydropower Production in the Sekong, Sesan and Srepok Rivers of the Mekong Basin

Abstract

Water flow patterns in the Mekong are changing because of on-going rapid hydropower development triggered by economic growth. Of immediate concern are the current and proposed hydropower dams in the transboundary Srepok, Sesan and Srekong (3S) Rivers, which contribute up to 20% of the Mekong's annual flows, have a large potential for energy production and provide critical ecosystem services to the downstream Tonle Sap Lake and Mekong Delta. The objective of this paper is to determine how the operation of the proposed largest individual dams and cascade dam schemes in the 3S Rivers will affect flow regimes and energy production. Daily flows were simulated over 20 years using the Soil and Water Assessment Tool and HEC-ResSim models for a range of dam development and operations scenarios. The development of all dams in the 3S basin under an operation scheme to maximize individual electricity production results in an average 98% increase in dry season flows at the 3S outlet. Over 55% of dry season flows changes are caused by seven proposed large dams, with the Lower Srepok 3 project causing the highest impact. The seven large dams will generate 33.0 GWh/day with a water volume of 17 679 x 106 m3, compared with the current and definite future dams generating 73.2 GWh/day with a much lower volume of 6616 x 106 m3. When a cascade of dams are operational, downstream dams with small reservoirs will produce more energy. However, the marginal increase in energy production from the development of additional dams in the 3S basin will decline rapidly relative to the required water storage increase,. Strategic decision-making on the future of each large proposed dam in the 3S basin needs to be considered by local governments after understanding cumulative operation effects and with further consideration to the potential impact on downstream ecosystem productivity and livelihoods. Copyright © 2016 John Wiley & Sons, Ltd.

Country
New Zealand
Keywords

Mekong, 670, Field of Research::09 - Engineering::0907 - Environmental Engineering::090702 - Environmental Engineering Modelling, HEC-ResSim, dam operation, hydrological modelling, Southeast Asia, hydropower, Field of Research::09 - Engineering::0906 - Electrical and Electronic Engineering::090607 - Power and Energy Systems Engineering (excl. Renewable Power), Field of Research::09 - Engineering::0905 - Civil Engineering::090509 - Water Resources Engineering

  • BIP!
    Impact byBIP!
    citations
    This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    56
    popularity
    This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
    Top 10%
    influence
    This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    Top 10%
    impulse
    This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
    Top 10%
Powered by OpenAIRE graph
Found an issue? Give us feedback
citations
This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Citations provided by BIP!
popularity
This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
BIP!Popularity provided by BIP!
influence
This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Influence provided by BIP!
impulse
This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
BIP!Impulse provided by BIP!
56
Top 10%
Top 10%
Top 10%
bronze